Combined Cycle Power Plant SIEMENS

205 MW Power Plant 2012 SOLD

SOLD

At a glance

  • The plant comprises three Siemens SGT-800 gas turbines and one Siemens SST-900 steam turbine, three HRSGs, ACC, RMS station, HV switchyard and balance-of-plant equipment.
  • Electricity is transmitted to an HV switchyard via approximately 28 km of 154 kV overhead line.
  • Commissioned as simple cycle in August 2012 and as combined cycle in June 2013.

Downloads:

Disclaimer: Although the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided.