22,000 bpd Oil Refinery High Conversion Type (incl. Hydrocracker)
General information
- The refinery was built at 20,000 BPD by UOP/Chiyoda in 1974 and mothballed in 1998.
- It was in very good operational condition when it was shut down. The plant was designed for Arab heavy crude and was later modified to handle Arab Light.
- It was regularly and thoroughly maintained and refurbished.
- The refinery is completely dismantled and packed in eighty containers plus break bulk of heavy large-sized machinery.
| Process units | Barrels per day | Tons per day |
|---|---|---|
| Crude Oil Distillation | 22,000 | 3,200 |
| High Vacuum Distillation 1 | 6,000 | 1,000 |
| High Vacuum Distillation 2 | 5,000 | 833 |
| Hydrocracker UOP-Isomax | 6,320 | 1,053 |
| LPG Treatment and separation | 5,355 | 893 |
| LSR Gasoline Merox | 1,095 | 183 |
| Naphtha Unifiner Unit | 2,410 | 402 |
| Platinum Reformer | 5,660 | 943 |
| Hydrogen Plant | 652,551 std ft³/hr | 18,478 Nm³/hr |
| Asphalt Oxidizer | 500 | 83 |
| Asphalt Oxidizer | 3,600 | 600 |
| Amine Regeneration Unit | 2,960 Nm³/hr | 593 |
| Waste Water Stripper | 857 | 143 |
| Visbreaker (idle) | 2,805 | 468 |
Downloads:
Disclaimer: Although the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided.