Combined Cycle Power Plant

205 BPD – Power Plant – 2012
  • Installed Capacity: 205,5 MW (50Hz)

  • Energy Production Capacity: 1640 GW/h/year

  • Plant condition: used

  • Construction start: 2011

  • Commissioning: Simple Cycle 2012, Combined Cycle 2013

  • Configuration: 3 Gas Turbines + 1 Steam Turbine

  • Gross / Net efficiency: 55,0% / 53,6%

The Power Plant at a glance:

  • The Power Plant is composed of 3 nos of Gas Turbines (Siemens SGT-800) and 1 no of Steam Turbine (Siemens SST-900), 3 nos of HRSG, 1 no of ACC, 1 no of RMS station, HV switchyard and BOP equipment.

  • The generated electricity is transmitted to a HV Switchyard through 28 km of 154 kV 2x1272 MCM overhead transmission line.

  • The plant is commissioned as simple cycle in August 2012 and as combined cycle in June 2013.